Services Before you commit

Building feasibility

Before you sign for a building, find out what it will really take to make it work: how many people it holds, what the fit-out is likely to cost, and what the landlord’s offer leaves out.

Exposed timber roof structure in the converted Cricklepitt Mill, Exeter
Devon Wildlife Trust, Cricklepitt Mill, Exeter

Agents’ floor areas and marketing plans rarely tell the whole story. A feasibility study tests each building against your brief, so you can compare options on equal terms and negotiate knowing what you are taking on.

Working alongside you and your agent, a study covers space plans, budgets and programme, and the parts of the building that drive cost: heating, cooling and ventilation, lighting, accessibility, the condition of any existing fit-out, and anything that needs surveying before work starts.

What it involves

What a feasibility study covers

Test fit

A layout showing how your brief fits each building, with desk numbers and the full mix of work settings.

Budget

An order-of-cost estimate for the fit-out, separating what the landlord provides from what you will need to add.

Building review

Services, condition, EPC rating, accessibility and any surveys needed before you commit.

Programme

A realistic timeline from signing to moving in, so each decision is made in time.

What to get right

Read the landlord’s offer carefully

Cat A, Cat A+ and “plug and play” mean different things in different buildings. Check exactly what is included before you compare rents, because a lower rent on a bare shell can cost more over the term than a higher rent on a well-specified floor.

Ask about the EPC. Minimum energy-efficiency standards already apply to commercial lettings, and a poor rating can mean disruption, or cost, later in the lease.

  • Compare buildings on total cost per person, not rent per square foot alone.
  • Be clear who pays for what: landlord’s works, contributions and incentives.
  • Check dilapidations obligations on both your current lease and the new one.
  • Allow enough time. A fit-out cannot start until the lease and design are agreed.

A good fit if…

  • You have two or three buildings on a shortlist.
  • Your lease ends in the next 12 to 24 months.
  • You want to know the real cost of a move before negotiating terms.

Probably not the right fit if…

  • You have already signed and need the fit-out designed. See office interior design.
Open office under a full-height A-frame roof at Strongbyte

From the archive

Strongbyte

Strongbyte found a run-down industrial unit in the Cotswolds. Seeing past the 1970s false ceiling, the design opened the building up to the full height of its A-frame roof, creating a light, airy workplace.

Read the case study

Questions

What clients usually ask

When is the right time for a feasibility study?

Ideally before heads of terms are agreed, so the findings can feed into the negotiation. If your lease ends within two years, it is not too early to start.

Is this the same as a building survey?

No. A building surveyor reports on condition. A feasibility study asks whether the building will work for your organisation and what it will cost to make it work. The two complement each other.